  • The Existing tarmac surface was cleaned down
  • An industrial strength weed killer was applied to the area
  • 3m Blocks were installed to the front of the drive in rustic gold
  • The existing pin kerbs were removed
  • The manhole was replaced with a load bearing lid
  • A half circle was dug out to the customers request
  • Limestone & Ashphalt was laid as a base
  • The area was over laid with a UVR Resin in Golden Pea